Yes, we sign NDA form upon review of said form by Losang authorized personnel.
Yes, we sign NDA form upon review of said form by Losang authorized personnel.
We need at least: 2D or 3D file of the part, mold requirement (such as number of cavities, required mold material if any, required gating system if any), and plastic material to be used.
Additional information (but are not necessarily needed) would be if mold is to be used for export or is it to stay in China for production, together with the quantity demand.
We have 40 Engineers at present (20 designers, 10 engineers, 10 CNC programmers).
Unless customer specifies otherwise, we usually purchase from LKM, the largest mold base manufacturer in China.
Normally, our payment terms as follows: 40% Deposit when P.O.; 40% after T1; balance 20% (Upon Final Sample Approved before shippment).
Depending on the complexity and size of the tool, but for standard size and standard design tool, the lead time is 30 to 35 days. Please note that lead time starts from the time the customer confirms the mold layout up to T1 date.
At present, the biggest tool we made has the mold size: 800mm x 2000mm x 900mm - this is a tool for a car bumper
Around 60 tools for average sized tools. It also depends on the complexity of the tool.
We have 25 units of injection machines with sizes ranging from 200 tons to 700 tons, automatic transfering system for molding parts, 2.5M CMM for 3D dimension check, etc.
We have 11 CNC machines, 14 EDM machines, 3 Wire-Cut machines, 1 Gun Drilling machine, 1 160T Die Spotting machine, lathe, milling and polishing equipments in our tool shop.